Highway Construction
ZUSMARSHAUSEN, GERMANY – JULY 15: Construction site of the extension of A8 highway from currently 4 to 6 lanes at Zusmarshausen, Germany on July 15, 2012. Heavy machinery is used for this massive project happening in a timeframe of over 2 years.
worker, working, highway, asphalt, construction, earth, land, new, motorway, machine, job, equipment, zusmarshausen, excavation, development, excavator, engineering, industrial, soil, vehicle, paving, develop, heavy, freeway, architecture, concrete, dig, site, traffic, infrastructure, transportation, digging, excavate, bulldozer, work, construct, machinery, germany, ground, technology, industry, road, digger, shovel, build, urban, truck, dirt, building
One Time Use License | |||
|
RF Unlimited License | |||
|
#22597 / Created by franky242 photography / JPG Image / 8.17 MB / 4288 x 2848
All images are protected by our Pixel Guarantee. Vectors will be converted to JPEGs for non-full sizes. Vector colors may vary in final file.
Report this product