Highway Construction
ZUSMARSHAUSEN, GERMANY – JULY 15: Construction site of the extension of A8 highway from currently 4 to 6 lanes at Zusmarshausen, Germany on July 15, 2012. Heavy machinery is used for this massive project happening in a timeframe of over 2 years.
shovel, building, construct, new, motorway, highway, truck, excavation, vehicle, construction, paving, machinery, asphalt, traffic, ground, digging, equipment, machine, excavate, excavator, digger, development, build, heavy, technology, develop, germany, transportation, earth, dirt, worker, concrete, land, road, working, dig, infrastructure, urban, bulldozer, zusmarshausen, architecture, freeway, engineering, soil, work, site, industry, job, industrial
One Time Use License | |||
|
RF Unlimited License | |||
|
#22597 / Created by franky242 photography / JPG Image / 8.17 MB / 4288 x 2848
All images are protected by our Pixel Guarantee. Vectors will be converted to JPEGs for non-full sizes. Vector colors may vary in final file.
Report this product