Highway Construction
ZUSMARSHAUSEN, GERMANY – JULY 15: Construction site of the extension of A8 highway from currently 4 to 6 lanes at Zusmarshausen, Germany on July 15, 2012. Heavy machinery is used for this massive project happening in a timeframe of over 2 years.
dirt, job, worker, bulldozer, ground, shovel, infrastructure, earth, heavy, new, industry, equipment, machinery, engineering, motorway, germany, industrial, machine, working, excavator, truck, work, zusmarshausen, build, technology, architecture, vehicle, freeway, road, digger, excavate, construct, highway, construction, urban, digging, traffic, land, develop, dig, development, building, site, asphalt, transportation, paving, soil, concrete, excavation
One Time Use License | |||
|
RF Unlimited License | |||
|
Model Release
Property Release
#19283 / Created by franky242 photography / JPG Image / 7.61 MB / 3989 x 2649All images are protected by our Pixel Guarantee. Vectors will be converted to JPEGs for non-full sizes. Vector colors may vary in final file.
Report this product