
Highway Construction
ZUSMARSHAUSEN, GERMANY – JULY 15: Construction site of the extension of A8 highway from currently 4 to 6 lanes at Zusmarshausen, Germany on July 15, 2012. Heavy machinery is used for this massive project happening in a timeframe of over 2 years.
ground, machinery, digging, construction, technology, urban, highway, road, site, development, digger, working, excavation, dig, excavate, worker, industry, freeway, zusmarshausen, develop, engineering, truck, architecture, work, shovel, bulldozer, job, excavator, machine, dirt, paving, asphalt, construct, heavy, earth, industrial, building, motorway, land, new, transportation, concrete, infrastructure, soil, traffic, build, germany, equipment, vehicle
One Time Use License | |||
|
RF Unlimited License | |||
|
Model Release
Property Release
#19283 / Created by franky242 photography / JPG Image / 7.61 MB / 3989 x 2649All images are protected by our Pixel Guarantee. Vectors will be converted to JPEGs for non-full sizes. Vector colors may vary in final file.
Report this product