
Highway Construction
ZUSMARSHAUSEN, GERMANY – JULY 15: Construction site of the extension of A8 highway from currently 4 to 6 lanes at Zusmarshausen, Germany on July 15, 2012. Heavy machinery is used for this massive project happening in a timeframe of over 2 years.
ground, concrete, urban, infrastructure, excavate, asphalt, vehicle, equipment, earth, construction, motorway, excavation, excavator, germany, technology, engineering, dig, traffic, highway, paving, bulldozer, job, digging, working, heavy, site, road, construct, dirt, land, machinery, worker, work, new, development, develop, transportation, freeway, digger, build, shovel, industrial, building, industry, truck, machine, architecture, zusmarshausen, soil
One Time Use License | |||
|
RF Unlimited License | |||
|
Model Release
Property Release
#19283 / Created by franky242 photography / JPG Image / 7.61 MB / 3989 x 2649All images are protected by our Pixel Guarantee. Vectors will be converted to JPEGs for non-full sizes. Vector colors may vary in final file.
Report this product





































