Highway Construction
ZUSMARSHAUSEN, GERMANY – JULY 15: Construction site of the extension of A8 highway from currently 4 to 6 lanes at Zusmarshausen, Germany on July 15, 2012. Heavy machinery is used for this massive project happening in a timeframe of over 2 years.
industry, machinery, asphalt, build, machine, working, infrastructure, motorway, site, truck, concrete, work, bulldozer, freeway, engineering, shovel, highway, technology, equipment, ground, construction, excavate, traffic, new, urban, excavator, dig, worker, industrial, development, excavation, vehicle, architecture, construct, building, germany, land, develop, heavy, soil, digging, transportation, dirt, paving, earth, digger, road, job, zusmarshausen
One Time Use License | |||
|
RF Unlimited License | |||
|
Model Release
Property Release
#19283 / Created by franky242 photography / JPG Image / 7.61 MB / 3989 x 2649All images are protected by our Pixel Guarantee. Vectors will be converted to JPEGs for non-full sizes. Vector colors may vary in final file.
Report this product